Auckland Council is replacing the playgrounds at Rutherford Reserve (main entrance from Archdall St in Meadowbank) and Ruka Reserve (entrances from Ruka Lane and Taitokerau St in St Johns).
Proposed designs and equipment are shown below. Feedback is welcome – send to by Friday March 6.
Rutherford Reserve
Construction expected to begin in spring with completion expected in December 2015. Note that the flying fox will remain; it is just out of scope for these plans.
Download a PDF version of the Rutherford Reserve Playground Design: Rutherford layout PDF
Ruka Reserve
Construction is expected to begin in August and be completed by mid-September, depending on the weather.
Download a PDF version of the Ruka Reserve playground design: Ruka layout PDF