Eastern Path is Go!

31 October 2015

A sod-turning ceremony was held on October 21 to mark the beginning of construction on the Eastern Path – a shared walk/cycleway that will pass through unused land between Glen Innes, St Johns and Meadowbank to Tamaki Drive.

View a PDF about the Glen Innes to Tamaki Dr shared path, and expected timelines.

UPDATE (November 10, 2015): Section two of the Eastern Path connects St Johns Road (by the Meadowbank Pony Club entrance) to the Meadowbank Train Station. To prepare for construction, ground testing will start November 10, 2015. View a PDF about what residents can expect from this testing.